Year
|
Service
|
Features of Plant
|
Inlet Flow & Pressure
|
Role in Project
|
|
2002
|
Goaf
|
*Built for trial drainage of goaf holes at low capital cost.
*Venturi ejector
*Driven by trailer air compressor *Eductor subsequently also used at Oaky North Mine
|
800 actual litre/s
-10 kPa gauge
|
*Devised process concept,
*Sized and specified equipment and pipes
*Produced detailed design for fabrication
*Supervised commissioning.
|
|